Tuesday, June 20, 2017

Biograghy of Engr. Amiolemen Abraham Osahon. Commissioner Nominee, Esan west LG, Edo State.

Engr Amiolemen Abraham Osahon
Reviewed by Prince Kelly O. Udebhulu.

Engr. Amiolemen Abraham Osahon was born 24th April 1970, hails from Ujemen, Ekpoma, Esan west local government of Edo state. A christian pastor at Living Faith Ministry, Abuja and married with children. He is a renowned civil Engineer and Consultant by profession.

HOBBIES: READING, CREATIVE WRITING AND COUNSELING.

SCHOOLS ATTENDED WITH DATES:

1) LADOKE AKINTOLA UNIV. OF SCIENCE &TECH, OGBOMOSO.  2009-2011.

2) EDO STATE UNIVERSITY, EKPOMA-EDO STATE: 1988-1994.

3)NAZACO COMPUTER TRAINING SCHOOL, LAFIA: 2001.

4) UJEMEN SECONDARY SCHOOL, EKPOMA: 1980-1985.

5) UJEMEN PRIMARY SCHOOL, EKPOMA: 1975-1980.

QUALIFICATIONS OBTAINED.

1) MBA (FINANCIAL MANAGEMENT)
2) B.ENGR. (CIVIL) SECOND CLASS UPPER DIVISION
3) DIPLOMA IN COMPUTER OPERATION- UPPER CREDIT
4) GOOD AUTOCAD KNOWLEDGE, CIVILSOFT DESIGN SOFTWARE AND MS OFFICE
5) WEST AFRICA SCHOOL CERTIFICATE.
6) GENERAL CERTIFICATE IN EDUCATION.
7) FIRST SCHOOL LEAVING CERTIFICATE.

PROFESSIONAL QUALIFICATION:

REGISTERED WITH COUNCIL FOR THE REGULATION OF ENGINEERING IN
 NIGERIA (COREN NO 12,293) JULY 2006.

WORK EXPERIENCE WITH DATES:

1) 
SPACE DESIGN CONSULTANTS. 
27, NAUCHOUT STREET
WUSE ZONE 1, ABUJA

DURATION: 2014 TILL DATE.

POSITION: TEAM LEADER/HEAD CIVIL & STRUCTURAL DEPT).

DUTIES: 

DESIGN AND SUPERVISION OF PROJECTS/ MANAGEMENT OF THE ENTIRE WORK FORCE CONSISTING OF ARCHITECTS, CIVIL/STRUCTURAL ENGINEERS, ELECTRICAL. MECHANICAL ENGINEERS, BUILDING TECHNOLOGISTS AND QUANTITY SURVEYORS EMPLOYED BY THE ORGANISATION AT SITE.

PROJECT:

SUPERVISION OF THE CONSTRUCTION OF 10,000 HOUSING ESTATE DEVELOPMNET FOR NLC/TUC AT APO TAFIYA DISTRICT ABUJA. JUST COMMENCED.

WORK DONE SO FAR:

SUB-STRUCTURE AND SUPER-STRUCTURE WORK ON 70 NUMBER 2,3 BEDROOM BLOCK OF FLATS ON 2,3 AND 4 FLOORS. THEY WERE CONSTRUCTED AS FRAMED STRUCTURE. MANY HAVE REACHED ROOFING STAGE.

SUB-STRUCTURE AND  SUPER-STRUCTURE WORK ON 15 NUMBER 4 BEDROOM SEMI DETACHED DOPLEX AND 14 NUMBER 5 BEDROOM FULLY DETACHED DUPLEXES. THEY WERE CONSTRUCTED AS FRAMED STRUCTURE. AT DIFFERENT STAGES OF COMPLETION.

2)
PEFF INTEGRATED RESOURCES LTD
SUITE 110, WILLAND PLAZA, 
ZONE 4, WUSE, ABUJA- NIGERIA

DURATION: SEPT 2008-   JULY 2014

POSITION: CHIEF EXECUTIVE OFFICER

DUTIES:

MANAGING THE ACTIVITIES OF THE COMPANY FOR PROFITABILITY AND TO MEET THE SET GOALS OF THE COMPANY.    
  
PROJECT:

SUPERVISING THE CONSTRUCTION OF A SHOPPING MALL IN KATEMPE DISTRICT ON 4 FLOORS FOR EL-FANTY NIG.LTD. THE FOUNDATION IS ON RAFT. NOW AT FINISHING STAGES

SUPERVISIING  THE CONSTRUCTION OF CITY OF LIGHT ESTATE AT
MBORA DISTRICT IN ABUJA. AN ESTATE OF 30 DUPLEXES AND THREE NO BLOCKS OF FLATS. WITH ITS  INTERNAL ROADS AND OTHER INFRASTRUCTURE.

CONSTRUCTION OF OGUN MODEL SCHOOLS IN IFO LOCAL GOVERNMENT AREA, CONSISTING OF 2 STOREY CLASSROOM BUILDING AND 2 NUMBER SINGLE STOREY HOSTEL BUILDING.

CONSTRUCTION OF 6 KM 2D SECURIFOR  FENCE AT 10MW WIND FARM AT LAMBA RIMI, KATSINA STATE (A SUB LET FROM MAIN CONTRACTOR- FOSAB GLOBAL ENERGY SERVICES LTD)

CONSTRUCTION OF A 2000 SEATER CHURCH AUDITORIUM. 43 CLASSROOMS BLOCK ON TWO FLOORS  AND TWO NUMBER SINGLE STOREY BULDING FOR HOSTEL AT  BEST SCHOOLS INTERNATIONAL, KAFFE DISTRICT.

SUPERVISION OF 3KM ROAD AND CONSTRUCTION OF THREE DETACHED
DUPLEXES FOR FESTRUT SHELTER LTD AT HER  ESTATE AT KATAMPE DISTRICT BEHIND ASO RADIO.

7) STRUCTURAL DESIGN AND /CONSTRUCTION OF A 5 BEDROOM DUPLEX ON RAFT FOUNDATION AT KARU SITE ABUJA FOR BAR. NWOKEDI.

8) SUPERVISION OF 8 NO 3 BEDROOM FLATS WITH ONE ROOM BQ IN A
BLOCK OF FLATS ON FIVE FLOORS (4 STOREY BUILDING) WITH A PENT HOUSE AT UTAKO FOR ARC. CHRIS NWOFOR.

9) CONSTRUCTION OF A V SHAPED DRAIN TO DIVERT A STREAM AT ENGR.SHOLA’S HOUSE AT ROAD 11, GWARINPA.

10) CONSTRUCTION OF A 31 NUMBER 2 BEDROOM SEMI DETACHED BUNGALOWS. 6 SEMI- DETACHED 3 BEDROOM BUNGALOW AND 8 FULLY DETACHED 4 BEDROOM FLATS ON A 5.3 HECTARE LAND IN KARU, FOR REAL ESTATE EMPORIUM, IKEJA,  LAGOS.

11)  EXTERNAL WORK (INTERLOCKING PAVING STONES LAYING) AT CHIEF   LAWANI’S HOUSE IN MAKURDI.

12) RE-DIRECTION  OF A RIVER COURSE FROM CLIENT’S PLOT TO ANOTHER DIRECTION WHICH INVOLVED DESIGN AND CONSTRUCTION OF A RETAINING WALL ALONG THE  REDIRECTED COURSE AT GWARINPA FOR DR. NWENE

13) DRILLING OF WATER BOREHOLES FOR SOME CLIENTS IN ABUJA.

14) CONSTRUCTION OF A TWO-STOREY BUILDING OF SIX-THREE BEDROOM FLATS WITH BASEMENT  FLOOR FOR ALH. AHMED AT  LAKE  CHAD CRESCENT, MAITAMA.

15) DESIGN/ CONSTRUCTION OF A-45M RETAINING WALL AT LAKE CHAD
     CRESCENT, MAITAMA.

16) RENOVATION/REMODELLING AND EXTERNAL WORKS ON A 4
BEDROOM DUPLEX AT MINISTRY OF WORKS ESTATE, GWARINPA FOR MR EDET EKERE.

17) SUPERVISION OF FENCING, GATE HOUSE ANS BOYS QUARTERS FOR 19
HOUSES AT PRINCE AND PRINCESS ESTATE ABUJA FOR CONSOLIDATED DISCOUNT LIMITED ABUJA.

18) ALLUMINIUM PARTITIONING WORK AT NNPC ZONAL OFFICE, BENIN
     CITY. A JOB GIVEN TO HIM BY NPDC, BENIN CITY.

 19) CONSTRUCTION OF A PURE WATER FACTORY AT ADO, KARU LOCAL
GOVT AREA, NASSARAWA STATE FOR MR NYONG.

20) RENOVATION /REMODELLING OF A 4 BEDROOM DUPLEX FOR MR   KINGSLEY ONUORAH AT GWARINPA HOUSING ESTATE..

21) EROSION CONTROL WORKS AT AMAOBA IME TO AMAOBA IKPUTU. A   1.8KM ROAD. IT CONSISTED OF SIDE DRAIN ON BOTH SIDES AND FILLING OF THE ROAD INCLUDING A BOX CULVERT. A FEDERAL MINISTRY OF ENVIRONMENT JOB SUPERVISED BY ME FOR BARON DEVELOPMENT NIGERIAN LIMITED

(3) 
SPARKLIGHT ENGINEERING CO. LTD.
BLK 12A, KINGS COURTS ESTATE
JABI AIRPORT ROAD, BYE-PASS, ABUJA

DURATION:  SEPTEMBER 2007 - JULY 2008
POSITION:  PROJECT MANAGER (ABUJA)

PROJECT:

CONSTRUCTION OF KINGS COURTS ESTATES PHASE 3.
CONSTRUCTION OF APO SHOPPING PLAZA. A THREE STOREY(4 FLOORS )COMPLEX WITH OVER 200 LOCK UP SHOPS LOCATED OPPOSITE LIVING FAITH CHURCH DURUMI.

DUTIES:

MANAGING MEN AND MATERIALS TO MEET THE TIMELINE OF THE PROJECTS. THESE CONSISTED OF THE ENGINEERS, QUANTITY  SURVEYOR AND OTHER  STAFFS IN THE TECHNICAL SECTION. QUALITY CONTROL OF THE JOBS.  OPTIMUM USE OF THE MEN AND MATERIALS TO MEET THE SET TARGET OF THE COMPANY'S JOB DELIVERY, IT ALSO INVOLVED MAKING REQUISITION FOR FUNDS AND MATERIALS FOR USE AT SITE.THEREBY ENSURING THAT ENGINEERING AND TECHNICAL DESIGNS  ARE WELL CARRIED OUT.

(4) GABCON ENTERPRISES NIGERIA LIMITED
HOUSE 17, 114 ROAD, OFF FIRST AVENUE RD
GWARINPA HOUSING ESTATE ABUJA.

DURATION: JANUARY 2007 TO AUGUST 2007

POSITION: PROJECT ENGINEER.

WORK DONE:

CONSTRUCTION OF ACADEMIC BLOCKS G. MICHAEL OKPARA UNIVERSITY OF AGRICULTURE UMUDIKE..A  PROJECT ON TWO FLOORS  FOR COLLEGE OF FOOD TECHNOLOGY..
 

(5) 
UTBS PROPERTIES LTD.
 SUITE 45, ZONE 2 CORNERSHOP,
 MAMBOLO STREET, WUSE.

DURATION: SEPT. 1998- JAN. 2003

 POSITION: PROJECT ENGINEER

DUTIES: EXECUTION OF ALL THEIR BUILDING JOBS IN NORTHERN STATES.

JOBS EXECUTED:

(1) CONSTRUCTION OF 20 UNITS OF 3-BEDROOM FLATS AT KADO, BESIDES
    C.A.C. QUARTERS ABUJA. IT CONSISTED OF THE ESTATES AND INFRASTRUCTURE.

(2) REHABILITATION OF MOBILE POLICE BARRACK IN  MINNA (A PTF PROJECT).

(3)CONSTRUCTION OF CLASSROOM BLOCKS, NURTW OFFICE, LOCKUP STORES, DRILLING OF 7 BOREHOLES AND ONE OVERHEAD TANK FOR NASSARAWA STATE GOVERNMENT.,

(4 CONSTRUCTION OF A 7 BEDROOM HOUSE AT ASOKORO FOR THE CHAIRMAN OF GEN. WUSHISHI,, THEN CHAIRMAN OF UTBS PROPERTIES  LTD.

(5)CONSTRUCTION OF A 2-STOREY BUILDING FOR HYPERLINK "mailto:FMW@H" FMW & H AT GADUWA ESTATE.

(6) 
 ATABRA AND ASSOCIATE
N0. 59 JAGUNMOLU STREET, BARIGA LAGOS.

DURATION: OCT. 1996 TO APRIL 1997

POSITION: SITE ENGINEER.

JOBS EXECUTED:

(1) CONSTRUCTION OF A STOREY BUILDING OF 2 NUMBER  3-BED- ROOM FLATS AT NEW GARAGE, BARIGA.

(2)CONSTRUCTION OF A FIVE-BEDROOM DUPLEX WITH TWO BEDROOMS
PENTHOUSE AND TWO NUMBER TWO BEDROOM FLAT ATTACHED    BUILT ON RAFT FOUNDATION AT PEDRO,-PALMGROOVE LAGOS STATE.
     
(3) CONSTRUCTION OF A 5-BEDROOM TWIN- DUPLEX AT PHASE IV IN           FESTAC TOWN,  BUILT ON RAFT FOUNDATION FOR MR. EDET EKERE.

(7)
HAVANAH EVANSON LTD:
   EJIGBO- LAGOS STATE.

DURATION: JANUARY TO -OCTOBER 1996

POSITION: SITE ENGINEER.

JOBS EXECUTED:
 
(1)CONSTRUCTION OF A 4-NO 3 BEDROOM FLAT IN A STOREY BUILDING AT OWOROSOKI BARIGA.
                           
(2)CONSTRUCTION OF A WORKSHOP/GARAGE AT IKOTUN.


(8)
  SASSHEM NIG. LTD
147c MURTALA MOHAMED ROAD, LOKOJA
KOGI STATE (NYSC).

DURATION: DEC. 1994- OCT. 1995.

POSITION: SITE ENGINEER.
       
PROJECTS: 

A) CONSTRUCTION OF INA-INA FILLING STATION AT GANANJA JUNCTION, LOKOGOMA – LOKOJA.

B)CONSTRUCTION OF NEW G.R.A ROAD, OFF OTUKPO ROAD MAKURDI (SURFACE DRESSING OF 1.5KM ROAD WITH SIDE DRAINS)

C) CONSTRUCTION OF ACCESS ROAD AND CAR PARK AT ADP HEADQUARTERS   LOKOJA – KOGI STATE.


OTHER JOBS DONE./ON-DOING:

CONSULTANT TO e-BARCLAYS MICRO FINANCE BANK FOR MONITORING OF CONSTRUCTION CONTRACTS FINANCED BY THEM (THIS INVOLVED FINANCIAL ANALYSIS OF CONTRACTS TO GIVE THEM AN IMFORMED TECHNICAL ADVICE ON THEIR  INVOLVEMENT.

CONSTRUCTION OF AN 8 BEDROOM HOUSE FOR THE DIRECTOR OF BEST SCHOOLS INTERNATIONAL AT KAFFE DISTRICT. ABUJA.

PROJECT MANAGEMENT/STRUCTURAL SUPERVISION OF KINGS COURT IV IN DAKI BIYU DISTRICT OF ABUJA BUILT BY SPARKLIGHT DEVELOPMENT COMPANY LTD. IT COMPRISES OF 12 SEMI- DETACHED 4 BEDROOM DUPLEXES.

ROAD CONSTRUCTION SUPERVISION FOR PARADISE ESTSTE IN KAFFE DISTRICT ABUJA.

CONSTRUCTION OF THE THEATRE BUILDING FOR SCHOOL OF PERFORMING ART,  FEDERAL COLLEGE OF EDUCATION, OBUDU, A PROJECT AWARDED TO BARON DEVELOPMENT LTD.

STRUCTURAL STEEL ROOFING AND RENOVATION OF SHOWROOM FOR ELIM MOTORS LTD AT AREA 8, GARKI, ABUJA.

ABOUT TO  START.

CONSTRUCTION OF 18.5KM ROAD OVERLAID WITH ASPHALT IN GWE WEST LOCAL GOVERNMENT IN BENUE STATE.

CONSTRUCTION OF THE NEW DAUGHTERS OF CHARITY HOSPITAL AT FO1 DISTRICT, KUBWA.CONSISTING OF MAIN HOSPITAL, SISTERS HOUSES AND OTHER BUILDINGS INCLUDING INFRASTRUCTURE.


HIS DESIRE:

TO BE A PROFESSIONAL ENGINEER THAT CAN HOLD HIS PLACE IN THE FIELD OF ENGINEERING AND ENGINEERING MANAGEMENT BOTH IN NIGERIA AND ABROAD,


No comments:

Post a Comment